Spare Parts Supply

Genuine consumables and replacement components for the GACS™ adiabatic cooling system, keeping air-cooled chiller pre-cooling performance consistent across commercial, industrial, and infrastructure sites.

Overview

Gerab Energy Systems supplies replacement components for GACS™ adiabatic pre-cooling units installed on air-cooled chillers across the region. Every part is drawn from the engineering record of the installed unit, so the item supplied matches the configuration commissioned at the site and preserves the operating condition of the pre-cooler across successive service intervals.

  • OEM adiabatic cooling spare parts
  • Nozzle, pump, and filter components
  • Water treatment and control replacements

Spare Parts

PAF for Membrane materials (Blue Materials)

  • Key Components Included Membrane materials for the chiller
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Water filters set

  • Key Components Included 5/10/20/50 Mic (set)
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Nozzles spare parts

  • Key Components Included Nozzle ceramic/ Nozzle sealing/ Nozzle filter set
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Pump Oil

  • Key Components Included SAE Pump Oil
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Pump Gasket for HP Pump

  • Key Components Included Seals kit for HP Pump (set)
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

UV Lamp

  • Key Components Included Water purification granules
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Biochemical/Biocide

  • Key Components Included Water treatment against Limescale (pcs) or biocide tablets
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

0.5 HP Booster Pump

  • Key Components Included Unit only
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Temperature & Humidity Sensor (Sensor Accuracy 2%)

  • Key Components Included Unit only
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Temperature Sensors

  • Key Components Included Unit only
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract

Solenoid Valve

  • Key Components Included Unit only
  • Availability Status Not Readily Available – Supplied on Order Basis
  • Typical Lead Time Subject to Availability
  • Support Available Yes – Installation & maintenance support as per the service contract